EPC and turnkey

Keep every contract clock and every handover record, without adding a commercial manager.

Your job is to deliver balance of plant and grid works, get paid and hand over cleanly. We prepare the paperwork round it, and you approve it.

The work that gets in the way

Notice dates disappear into email

A missed contract notice can put entitlement at risk. Check the contract’s notification requirements and exceptions.

NEC guidance on notice requirements

Revisions and payment changes need checking

Matching subcontractor drawings and checking changed bank details take time before work or payment can proceed.

Handover records are rebuilt at the end

Gathering as-built and commissioning records again adds work when the team should be closing the job.

What changes

Works with all three. Most useful first: OpsWork, Letterbox, HVCO.

Built around a working HV design firm

Saqib Shah has 16 years in HV design. Saqib Engineering is an ISO 9001 certified HV design consultancy in Rotherham.

OpsWork runs in your own Microsoft 365 and Azure UK South. You approve what leaves.

HVCO puts sources beside values for your engineer to check.