Cable design

Cable route studies from 11 kV to 132 kV, drafted with sources beside every value, ready for you to check and issue.

Your job is to route, rate and issue cable studies on time. We prepare the paperwork round it, and you approve it.

The work that gets in the way

Reports take days to assemble

Collecting route information and preparing the write-up consumes engineering time.

Crossings and cover need separate checks

Finding the right source and recording it for each section adds to the study workload.

Construction packs are left to site

Rebuilding schedules and handover records later means handling the same information again.

What changes

Works with all three. Most useful first: HVCO, OpsWork, Letterbox.

HVCO studies and outputs: Cable rating, Crossings, Bonding, Trench and civil, Trenchless, Bridge, Subsea, Trench cross-sections, 3D trench views, Construction pack, Cable schedule, Cut schedule, Drum schedule, Joint schedule, Material schedule, Pulling plan, Traffic proposal, DXF route plan, Commissioning checklist, As-built records, Handover pack.

Built around a working HV design firm

Saqib Shah has 16 years in HV design. Saqib Engineering is an ISO 9001 certified HV design consultancy in Rotherham.

OpsWork runs in your own Microsoft 365 and Azure UK South. You approve what leaves.

HVCO puts sources beside values for your engineer to check.

Related guides