Features

Everything OpsWork prepares for your firm.

Three products, one list of features each. Choose a product to jump to it.

OpsWork

Six functions that prepare the routine work across the firm. You approve everything before it leaves.

Enquiries and quotes

Emma

Enquiries read and drafted into a quote for you to approve.

e.g. an enquiry from Hartley Energy arrives; a draft quote waits for your approval.

  • A summary of each enquiry from your connected mailboxes
  • Tender notices scanned and tracked
  • Idle enquiries flagged to you after five days
See what is included

Enquiries and proposals

  • Enquiry classification, scope, urgency and completeness
  • Acknowledgements, quotations and fee estimates for approval
  • Quote follow-up and requests for information

Business development

  • Tender discovery and portal coverage
  • LinkedIn and client-outreach drafts
  • CRM contacts, account intelligence and sales forecasts
  • Win/loss records and case studies from completed projects

Documents, quality and safety

Sarah

Document revisions, issue records and quality registers kept together.

e.g. Rev C of a cable schedule is prepared for issue, with recipients recorded.

  • Issue packs prepared, with recipient evidence recorded
  • An audit-readiness view built from the quality records you keep
  • CDM and HSE registers held with their evidence
  • Competency records kept

Records and tracks. Accreditation and statutory duties stay with the people appointed to them.

See what is included

Quality and safety evidence

  • NERS passport, competency matrix, annual reviews and authorising-officer sign-off
  • ISO 9001 audit evidence and technical audit register
  • CDM designer risk, COSHH and method-statement registers
  • Project RAMS, inspection and test plans, and LRQA surveillance evidence

Management systems and documents

  • ISO 14001 aspects, objectives and compliance-evaluation records
  • ISO 45001 hazard, incident and management-review records
  • ISO 19650 document control, BIM execution plans and information delivery plans

Projects and contracts

James

Contract dates, notice clocks and registers in one place.

e.g. a contract expiry date for Hartley Energy shows up in your daily flags.

  • Compensation event notice clocks start when you log the event
  • Contract, framework and compliance dates checked daily and flagged
  • Project, risk, variation and contract registers held in one place

Legal items are flagged to your director or solicitor.

See what is included

Project management

  • NEC4 early warnings, compensation events and programme milestones
  • DNO outage notification windows and customer notices
  • NERS project lifecycle procedure
  • Meeting transcripts, minutes and actions
  • Project RFI and technical-query registers
  • Submittal cycles, overdue reviews and programme drift
  • Final-account support

Contracts and legal records

  • Customer, supplier, framework and subcontractor contract registers
  • Liability caps, indemnities, review dates and PI exposure
  • NDAs by counterparty, scope and expiry
  • Framework obligations and regulatory compliance calendar
  • Disputes and claims: status, value and next action
  • Contract review flags for the director or solicitor
  • Anti-bribery, gifts and company-secretarial records

Engineering

Robert

Technical work prepared for your engineer to check.

e.g. a technical query from Hartley Energy is logged and tracked until answered.

  • Technical queries tracked and RFI responses drafted for engineer review
  • Calculation templates and imported study results organised for checking
  • Drawing registers, revisions and transmittals kept in order
  • A standards index with clause pointers; add your own licensed standards
See what is included

Engineering information

  • The engineering reference library and the standards references you are licensed to use
  • Drawing and calculation registers, including DWG metadata
  • Search by clause, voltage band, DNO and project context
  • Calculation inputs, source single-line diagrams and stale-parameter review
  • Cable-rating inputs and earthing reference context for a qualified engineer

Coordination and source control

  • CDE file naming, revision control and information-container records
  • Reference relationships between documents and calculation assumptions
  • Publisher access, customer uploads and revision monitoring

Fees and finance

Michael

Finance records and drafts prepared for you to review.

e.g. an overdue invoice for Hartley Energy is flagged so you can chase it.

  • An application for payment drafted from the schedule you supply
  • Invoice drafts recorded for your approval, with overdue invoices flagged for chasing
  • Purchase orders and expenses recorded
  • VAT and CIS drafts built from the figures you record
See what is included

Project commercial administration

  • Applications for Payment and supporting evidence
  • Compensation-event cost records
  • Work in progress, budgets and actuals
  • Cashflow forecasts and debtor follow-up drafts
  • Retention and bond records
  • Accountant packs

People and admin

Paul

People and subcontractor records kept in one place.

e.g. a training certificate nears its expiry date and a reminder is raised.

  • Leave and absence recorded
  • Starter, leaver, right-to-work and DBS records kept
  • Training and subcontractor records, with expiry reminders

Records the determination. It does not decide employment status.

See what is included

People and subcontractors

  • Pre-engagement records: customer IR35 determinations, insurance, CSCS, CHAS/SSIP and RAMS
  • Framework PQQ renewals, including SSEN, NGED, UKPN and SPEN
  • CPD, training and competence records
  • Insurance-renewal coordination
  • Companies House filings
  • HR onboarding and right-to-work review records

Letterbox

Letterbox reads your engineering email like a project engineer and has the work done before you open your laptop.

Catch contract dates in your email

Dates in your email, suggested with their source. You confirm each one.

e.g. a compensation event email: Letterbox suggests the NEC4 period, you confirm the date.

  • NEC4 notices, with the period offered
  • Payment and pay less notice dates
  • Tender deadlines, kept once you confirm the date
  • Connection clocks
See what is included

Clocks

  • Compensation events
  • Early warnings
  • Payment notices
  • Pay less notices
  • Tender deadlines
  • Connection clocks

You confirm

  • Source beside each date
  • Start date

Where shown

  • Email card
  • Today

Check drawing revisions against your register

Checks the drawing revision in an email against your register.

e.g. an email attaches Rev B but your register says Rev C. Letterbox flags it.

  • Revisions read from attachment names
  • Supplier document status, read from the subject
See what is included

Checks

  • Attachment revision against your drawing register
  • Supplier document status in the subject

Result

  • Email flag
  • Reply draft asking for the right revision

Check before you pay new bank details

  • Flags emails that change bank details.

e.g. a supplier email with new bank details gets a note: call them on your usual number first.

See what is included

Spots

  • Changed bank details
  • Look-alike sender names

Action

  • Call on your usual number
  • Mail is never blocked or deleted

See who you are waiting on

Keeps track of the replies you are waiting for.

e.g. Northfield Cables has not replied to your Monday email, so it is listed.

  • Each one listed with the name of who owes it
  • A chaser draft when you ask for one
  • A weekly summary of what slipped
See what is included

List

  • Who owes the reply
  • How long it has been outstanding

Follow-up

  • Chaser draft when you ask
  • Weekly summary of what slipped

A brief before your day

A morning brief that gets you ready for the day.

e.g. a morning brief shows what needs you and what is already sorted.

  • A morning brief
See what is included

Morning brief

  • What needs you
  • What is already sorted

Sort your inbox and prepare replies

Your mail sorted, with replies drafted for you to send.

e.g. a client query lands in Needs you, with a draft reply in Drafts.

  • Email groups, with what needs you first
  • Unsent reply drafts waiting in Drafts for you to edit
  • Remembers the email groups you approve
  • Notifications paused at the times you choose
See what is included

Email groups

  • Needs you
  • FYI
  • System
  • Urgent

Replies

  • Drafts in your style in Drafts

Your preferences

  • Approved filing
  • Edit and Forget controls
  • Notification times you choose

Safety

  • Never sends
  • Never deletes
  • Undo on every move

HVCO

HVCO drafts the cable route study for UK grid connections from 11 kV to 132 kV, with sources shown beside the values.

Cable design and crossing study

  • A draft cable design and crossing study, with calculation worksheets.

e.g. a draft study for a sample route lists its crossings and calculations.

See what is included

Studies

  • Cable rating
  • Crossings
  • Bonding
  • Trench and civil
  • Trenchless
  • Bridge
  • Subsea

Report

  • Draft study on your letterhead
  • Calculation worksheets
  • Sources and dates beside values
  • Assumptions
  • Questions to ask

Route options appraisal

  • Routes compared on the checks you choose and on cost; the cheapest option that passes is flagged.

e.g. four route options compared; the cheapest option that passes the checks is flagged.

See what is included

Compares

  • Route options on your chosen checks
  • Cost

Outputs

  • Cheapest passing option flagged
  • Comparison table
  • DXF route plan

Trench design and cross-sections

  • Cross-sections and 3D views of the trench, from the dimensions you record.

e.g. a cross-section shows two circuits in one trench, labelled with your dimensions.

See what is included

Drawings

  • Trench cross-sections
  • 3D trench views
  • Labels with your dimensions

Checks

  • Duct fit

Network area, proposed from your route

  • Proposes the network area from your route’s first point, using NESO area outlines. You confirm it, and the source is shown.

e.g. a route starting in the north of England gets a network area to confirm.

See what is included

Output

  • Network operator area proposed from the route start
  • NESO area outlines
  • Source shown
  • Your confirmation

Minimum cover check

  • Cable cover checked against minimums taken from operator documents, where the land use and voltage are recorded.

e.g. a cable under a verge is checked against a minimum cover figure.

See what is included

Checks

  • Operator minimum cover
  • Land use
  • Voltage

Cable sizing checks

  • Design current, voltage drop, losses and short-circuit checks, with the inputs and the working shown.

e.g. a 400 m circuit is checked for voltage drop and losses.

See what is included

Checks

  • Design current
  • Voltage drop
  • Losses
  • Short circuit

Record

  • Inputs and working

Construction pack

  • A draft pack: cable, cut, drum and joint schedules, with a pulling plan and traffic proposal for review.

e.g. a pack lists each cable cut and drum, with a pulling plan for review.

See what is included

Schedules

  • Cable
  • Cut
  • Drum
  • Joint
  • Material

Plans

  • Pulling plan
  • Traffic proposal

Drawings

  • DXF route plan

Commissioning, as-built and handover records

  • A commissioning checklist, as-built records and a handover pack, compared with a tolerance you set.

e.g. installed length is compared with design, using the tolerance you set.

See what is included

Records

  • Commissioning checklist
  • As-built records against your chosen tolerance
  • Handover pack